Short version (for speed readers)
-
01 / 02 meters are not supported for general pricing
-
There is one exception: Smartest Energy
-
If Smartest will take it, that is where the sale goes
-
Minimum EAC rules still apply
-
No loopholes. No retries. No “just checking”.
🧾 What are 01 / 02 meters?
-
01 = Domestic unrestricted
-
02 = Domestic Economy 7
These are domestic profile classes, not business meters.
Yes, even if the site has staff, a till, and a sign that says “Ltd”.
❌ Default position (this is the rule)
We do not price Profile Class 01 / 02 meters.
Why?
-
Most suppliers will reject or cancel post-live
-
Settlement fails = no D19-flows = no commission
-
MHHS is tightening validation, not relaxing it
Trying to “just see if it goes through” wastes time and achieves nothing.
⚠️ The only exception: Smartest Energy
Smartest Energy is the only supplier that will consider 01 / 02 meters — and only under strict conditions.
This is an exception, not a new standard.
✅ Conditions for submitting 01 / 02 to Smartest Energy
You may proceed only if all of the following are true:
-
The supply is genuinely commercial in use; and
-
A current Business Rates bill is provided; and
-
The site meets Smartest Energy minimum EAC requirements
The customer will be expected to undergo a meter upgrade and topline upgrade. If refuse = no commission.
Miss any one of these → do not submit.
📄 Proof requirements (non-negotiable)
Accepted
-
✅ Current Business Rates bill showing the site address
Not accepted
-
❌ Council tax bills
-
❌ Utility bills
-
❌ Lease or tenancy agreements
-
❌ Photos of the premises
-
❌ Emails explaining why it “should count”
-
❌ Anything creative
No Business Rates bill = no submission. End of discussion.
🎯 Where the sale goes
If Smartest Energy will accept a compliant 01 / 02 site:
👉 That is where the sale should be placed.
There is no:
-
“Can we also try another supplier?”
-
“Can we just get a comparison?”
-
“Can we see what rates look like elsewhere?”
If Smartest is the only door open, that’s the door you walk through.
🔁 Want wider supplier choice?
Then the process is boring, slow, and unavoidable:
-
Customer arranges a meter upgrade with the supplier
-
Customer requests a topline / profile class change
-
Wait for ECOES to update
-
Then submit the sale
⏱️ ECOES timing (read carefully)
-
Upgrade confirmed at 08:00
-
ECOES still shows 01 / 02 at 08:01
This is normal.
ECOES does not update instantly.
Re-sending the same sale or chasing internally does not speed it up.
We may request proof once ECOES reflects the change.
🧠 Final reminders (please absorb these)
-
01 / 02 = blocked by default
-
Smartest Energy = only exception
-
Business Rates bill = mandatory
-
Minimum EAC rules still apply
-
ECOES must update before broader submission
Or in plain English:
No upgrade, no proof, no ECOES change, no EAC = no sale.
If you are unsure, re-read this article before raising a ticket.
Asking again will not change the rules; it will only shorten the reply.